ABSTRACT
The aim of this design work is to
allow traffic light to rotate over a designated time interval between the two
roads concerned i.e IMT and ESUT Junction. This design will control and monitor
devices and cars within its environment i.e the junction.
It will as well steer small vehicles
showing them how to obey the traffic instructions coming from the traffic
signals. The system is designed to operate in a red time mode to monitor the
volume of traffic light.
The project will determine whether any
of the devices is defective and of the same time, send signals to indicate
faulty devices. The software also includes the maintenance of these devices
giving warning signs wherever a fault is detected.
The software is designed to detect the
flow of traffic showing how and when vehicles will be passed or in order words,
it is the aim of the project to solve problems as a result of manual and
simulate the existing system into a new system.
DEDICATION
This piece of work is dedicated to my
parents Mr. & Mrs. Declan .P. Ihemadu who made it possible for me to be in
this great institution to acquire knowledge.
I also dedicated this work to all my
lecturers especially My Head of Department (HOD) Mr. Aneke I.C. for his
encouragement to us.
ACKNOWLEDGEMENT
I wish to acknowledge the
wonderfulness of God to me and also want to acknowledge his grace to our
lecturers and my classmates especially Chidiebere and Uche Onyiwu.
I appreciate all the graces he has
bestowed in me in the course of writing this project and also appreciate the
support rendered to me by my lecturers and coursemates.
ORGANIZATION OF WORK
This project has seven chapters. Each
chapter deals with the chapter one. This chapter introduces the statement of
the problem purpose of this study. The aims and objectives of the program. The
scope, limitations and constraints, assumptions of program, and the definition
of terms.
Chapter two – This
chapter
Chapter
three – Deals with the description and analysis of the existing
system with regards to the fact finding methods, organizational structure,
objectives of the existing system, the input, process and output analysis, the
information flow diagram, problems of the existing system and finally
justification of a new system.
Chapter
four – Deals with the design of the
new system taking into consideration of the output specification and design.
Input specification and design file design, procedure chart, system flow chart
and the system requirement.
Chapter
five -Talks of the implementation,
program design, program flowchart,
pseudocodes. Source program and test run.
Chapter six – Deal
with the documentation of the program.
Chapter
seven – this final chapter deals with the conclusion and
recommendation and the bibliography.
TABLE OF CONTENTS
Title Page
Certification
Dedication
Acknowledgement
Abstract
Organization
of the work
CHAPTER ONE
1.0 Introduction
1.1 Statement of problem
1.2 Purpose of the study
1.3 Aims and objectives
1.4 Scope or Delimitations
1.5 Limitations and constraints
1.6 Assumptions
1.7 Definition of terms
CHAPTER TWO
- Review of related literature
CHAPTER THREE
Description
and analysis of the existing system
3.1 Fact finding methods
3.3 Objectives of the existing system
- Input, process, output analysis
- Input, process, output analysis
3.6 Problems of the existing system
- Justification of the new system
CHAPTER
FOUR
Design of the new
system
- Output specification and design
4.2 Input specification and design
4.3 File design
CHAPTER FIVE
Implementation
5.2 Source program
5.3 Program flowchart
CHAPTER SIX
Documentation
CHAPTER SEVEN
Conclusion
and Recommendation
Bibliography
CHAPTER ONE
INTRODUCTION
Computer technology is one of the
achievements made by man. Its benefit has seen man being able to solve some of
his immediate problems. It has opened the door to a large number of important
applications that were not economically feasible in the past. Its applications
ranges from automating devices in most offices where most tasks are highly
automated to on-line computer control of industrial and commercial process for
which this project is concerned.
The computer therefore presents a
great opportunity to develop system more economically not simply because the
availability of methodology and theories that could not previously be
economically justified, among these numerous applications of the computer is
it’s use in controlling and monitoring traffic, this is reality a very
expensive application because it has several features to utilize in the design.
The main reason for embarking on this
project is because it is noteworthy that traffic system in ESUT-IMT Road
Junction is very poor which results in traffic jams and most of which cause
automobile accident within this junction due to congestion among road users
with the increasing population and consequent increase in economic activities.
However it is noteworthy to note that urban traffic jams are not limited to
developing countries alone, but other developed countries still experience the
same problem given the nature of their road network.
The reason as stated above for the problems being encountered for non-application of computer in the monitoring and controlling of the junction is enough to automate the traffic control system using it as the best alternative to direct the flow of traffic effectively and efficiently.
1.1 STATEMENT OF THE PROBLEM
The reason for embarking on this particular project is due to the fact that traffic jam is a problem within this T-junction because it has caused most of the automobile accidents and mishaps. This problem could also be attributed to the mistakes made by traffic policemen who might suddenly stop a line in order to give preference to some class of individuals and therefore pass wrong line or road. Since there is also on increasing population made up of students of the two higher institutions as well as the economic activities, road users experience what can be called ‘a diary ordeal’ as most of their time is spent on the road as a result of congestion cause holdups. This situation affects mainly ESUT and IMT students and lecturers, as they are the major users of this T-junction.