TABLE OF CONTENTS
Title
page
Certification
Dedication
Acknowledgement
Table
of contents
Organization
of work
Abstract
CHAPTER ONE
INTRODUCTION
Purpose
of Study
Aims
and Objectives
Scope
of Study
Limitations
of the Study
Assumptions
Definition
of Terms
CHAPTER TWO
LITERATURE
REVIEW
Scheduling
Concept
Scheduling
Theory
Assumptions
of Scheduling Theory
Scheduling
System for Transport Company
Single
Channel Schedule
Multi
Channel Schedule
CHAPTER THREE
DESCRIPTION
AND ANALYSIS OF THE EXISTING SYSTEM
Investigation
of the Existing System
Fact
Finding Methods Used
Organization
Flow Diagram
Objectives
of the Existing System
Input,
Process and Output Analysis
Information
Flow Diagram
Problems
of the Existing System
Justification
for New System
CHAPTER FOUR
DESIGN
OF THE NEW SYSTEM
Output
Specifications and Design
Input
Specifications and Design
File
Design
Procedure
Chart
System
Flow Chart
System
Requirement
CHAPTER FIVE
IMPLEMENTATION
Program
Design
Program
Flowchart
Pseudocode
Source
Program
Test
Run
CHAPTER SIX
DOCUMENTATION
System
Documentation
Modules
and Procedures
User’s
Guide
CHAPTER SEVEN
CONCLUSION
& RECOMMENDATION
Conclusion
Recommendation
Bibliography
ORGANIZATION OF WORK
This
research work takes a look at the application of a computer in scheduling in a
transport company, that will generate optimal luxury buses and driver schedules
for a given dispatching scenario.
Chapter
one introduce the statement of the problems, explains the purpose of the study
and the aims and objectives of the research work. It gave the general overview
of the conventional method the extent it will cover (scope), its limitations
and definition of some terms related to scheduling.
Chapter
two reviews the related literature.
Chapter
three described and analysis the existing system. Fact finding method used are
also discussed. It explains the problems of the existing system and finally
justifies the new system.
Chapter
four deals with the actual research work done, designing of the new system
computer base scheduling also highlights the system requirement.
Chapter
five discusses the actual simulation of the new system.
Chapter
six contains the system documentation user manual.
Finally,
chapter seven briefly summaries concludes the project & recommends the user
of the new system.
ABSTRACT
This
project work is all about design and implementation of a computer based
scheduling system for a transport company.
A
computer based scheduling system for a transport company generates optimal
luxury bases and driver schedules for a given dispatching scenario. It is a
stand-alone windows based application with extremely user’s friendly interface.
It
consists of data management and scheduling modules.
This
project work with vividly deal with the impact of computer based schedule
system for a transport company.
CHAPTER ONE
INTRODUCTION
STATEMENT OF PROBLEM
A
scheduling situation in a transport company develops when buses are expected to
dispatch effectively.
Scheduling
needs the dispatch and general information about routes to generate optimal
transportation resources schedules. Lack of management and scheduling modules
have cause a big problem for most transport companies. As a result of these
problems, these transport companies have not been able to present charts and
text reports for these companies.
These
transport companies can not export solutions as text files in MS Word or MS
Excel.
Lack
of scheduling algorithms have led to lack of generating of the different
resources schedules.
Lack
of near-optimal resources schedules generation have prevented benchmarking an
existing solution. Existing routes along with resources assignments can not be
imported into the system “as is’ and calculate to reproduce the benchmark
solution. The solution can not be generated and compared to the benchmark
solution. The two solutions cannot be compared in the form of reports and
Grantt Charts to identify opportunities for better resources utilizations.
Route
data can not be imported in the form of ASCLL files.
There
is no data import wizard that will guide user’s through a set up process for
importing route data into the system. Lack of data view to enable user’s to
sort the routes based on different criteria (route ID) Departure Time etc).
PURPOSE OF THE STUDY
This
research work is meat to find out whether the above mentioned problems can
effectively be eradicated by employing computer system to control the
scheduling system of a transport company. In other words, to find solution to
these problems mentioned above using a computer system.
AIMS AND OBJECTIVES
The
aim and objective of this research work is to come up with a more suitable
scheduling system in a transport company. (A computer based scheduling system)
that can eliminate completely the above mentioned problems using a computer
system. For instance, to come up with a scheduling system that can generate
optimal buses and driver schedules for a given dispatching scenario.
Perhaps,
the new system will not just eradicate the problems which will automatically
improve the schedules.
SCOPE OF THE STUDY
This
project work covers every area of scheduling activities where a scheduling tool
generates optimal buses and drives schedules for a given dispatching scenario.
For instance, this tool provides an estimate of required number of buses and drivers for a particular dispatching scenario. It also generates resource scheduling that can result in significant cost reduction by using the optimal number of resources required.
DESIGN AND IMPLEMENTATION OF COMPUTER BASED SCHEDULING SYSTEM FOR A TRANSPORT COMPANY A CASE STUDY OF THE YOUNG MOTORS LTD ENUGU STATE