ABSTRACT
The purpose of the study is to computerize quality control
system in production (A case study of Anammco Nig. Ltd Enugu) and to develop a
computer packages whereby the technique observed from the manual method can be
improved on.
It is a
known feet that the manual method of quality control in production has been
associated with lots of inaccuracy in quality control and this has lead to
early break down of parts when in service.
The software when developed will facility and enhanced the mode and methods of quality control in spare parts production of Anamco.
TABLE OF CONTENTS
Title page
Certification
Dedication
Acknowledgement
Abstract
Organization
of the work
Table of
contents
CHAPTER ONE
- Introduction
1.1 Background information on Anammco
- Justification of the project
- Purpose of the study
- Scope of study
- Aims and objectives
CHAPTER TWO
CHAPTER THREE
- Description and analysis of the existing system
- Objectives of the existing system
- Justification for the new system
CHAPTER FOUR
- Design of the new system
- Output specification and design
- Input specification and design
CHAPTER FIVE
CHAPTER SIX
CHAPTER SEVEN
References
CHAPTER ONE
INTRODUCTION
A quality control system in production management is a
qualitative technique with strong financial implications having direct relationships
with production, marketing, purchasing and financial politics.
Also, it is a system used in the management of stocks held
by any organisation as it concern addition to, storage and removals from the
trading stock with appropriates record keeping.
ANAMMCO LTD, Enugu as an assembly plant maintains a large
amount of stock vehicles spare parts which are imported from any of her
vendors, Vce:- MBAG. Mercedes Benz AG Germany,
MBBRAS. Mercedes – Benz Brazil or MBE –
Mercedes. Benz Espama for the production
line or sales to distributors or authorized agents dealers.
The stock are held for various among which are:-
- To ensure unit sufficient goods are available to meet
anticipated demand.
- To provide a better between production processes.
This is, applicable to work in project stocks which
effectively decouple operation.
- To meet possible shortage in future
- To absorb seasonal fluctuation in usage or demand.
- To enable production process to flow smoothly and
efficiently.
- As a necessary part of the production process.
All these are logical yet, stocks accumulate due to the
Less promise worthy reasons which are:-
- Obsolete items are retained in stock
- Poor or non-existing inventory control resulting in
over targe orders, replacement orders being out of phase with production etc.
- Inadequate or non-existing stock records
- Marketing departments.
Whether as a deliberate policy or not, sticks, represents
an investment by the organization. Thus,
as with any other investment, the cost of holding stock most be related to the
benefit to benefit to be gains. To do
this effectively the cost must be identified and this can be done in the three
categories:-
- Cost of obtaining stock
- Stock out costs.
All these spare parts which may how similar menu by
description varies greatly among themselves depending on the type or model of
vehicle using them. Thus, the management
and operation of stories function and the control of stock on only be performed
in on efficient manner when there is an appropriate means of up turning and storing
information and a facility for the analysis and use of this information.
In the light of the above, ANAMMCO Ltd Enugu maintains a
visible record system returned to as KARDEX, a manual form of inventory control
system.
As a prerequisite in any quality control system, ANAMMCO
Ltd maintains a peculiar but unique coding system such that all the numerous
spare parts are each uniquely coded and identified for accurate and specific
information on them.
The operation of the KARDX was often prove to redundancy
or duplication of items whenever there is instilling; it requires a lot of
paper work with their possible variations or discrepancies during
documentation; it involves, so many people thereby investing a lot of man
hours; increased cost of procure storage of non-moving or obsolete items leads
to customer dissatisfaction due to time wasting and unavailability of
information. Thus, the efficiency of the
system is greatly dependent on human factor and as such accuracy.
So, it is an attempt to rectify and modify the above inadquaciets that we have decided to develop and implement on integrated computerized stock control system so as to maximize the operation efficiency, ensure customer satisfaction based on quick.
Services, minimize the non-hour requirement involved, reduce the running costs, guarantee accuracy and at the same time generate reports that assist management in her decision making as it concerns planning, organizing and controlling.
BACKGROUND OF THE STUDY (MB-ANAMMCO LTD) ENUGU.
After the recommendation of the fourth (4th)
National Development plan in 1975 to increase the number of automobile plants
in Nigeria
in order to address the problem of transportation, a Mercedes Benz Plant was
chosen. Other reasons for establishing
the plant being to:
Diversification and Rapid industrialization of the Nigeria Economy
Modernization of industrial workers
Indigenous man-power training
Technology transfer and
Manufacture and Assembly of Mercedes Benz commenced vehicles and trucks in Nigeria.