TABLE
OF CONTENT
Cover page
Dedication
Certification
Acknowledgement
Table of content
CHAPTER
ONE
- Introduction
- Block
diagram of an automatic phase changer
- Component
list
CHAPTER TWO- COMPONENT DESCRIPTION
- Comparator
- Zener diode p.n junction, electron, avalanche diode, avalanche
breakdown}
CHAPTER THREE
- Comparator/voltage sensor stag.
- Flip flop/switching Transistor stage
- Transistor switching circuit
CHAPTER FOUR
CHAPTER FIVE
CHAPTER
ONE
1.0 INTRODUCTION
Raw power instability in developing countries
creates a need for automation of electrical power generation or alternative
sources of power to back up the utility supply.
This automation is required as the rate of
power outage becomes predominantly high. Most industrial and commercial
processes are dependent on power supply
and if it processes of change-over are manual, serious time is not only wasted
but also creates devices or machine damages from human error during the
change-over connections, which could bring massive losses. The starting of the
generator is done by a relay which switches the battery voltage to ignition
coil of the generator while the main power relay switches the load to either
public supply or generator. Fig 1 shows the generalized block diagram of the
system. The approach used in this work is the moduler approach where the
overall design was first broken into functional block diagrams, where each block
in the diagram represents a section of the circuit that carries out a specific
function. The functional block diagram fig 1 also shows the interconnection
between these blocks. Each section of the block is analyzed below. A manual
change-over switch consists of a manual
change over switch box, switch gear box and cut out fuse or the connected fuse
as describe by the by rocks and Mazur{1993}. This change-over switch box
separate the sources between the generator and public supply when there is
power supply outage from public supply, someone has go and change the line to
generator. Thus when power supply is
restored, someone has to put off the generator and then change the source line
from generator to public supply.
In
view of the above manual change-over switch system that involves man power in
starting the generator and switching over from public supply to generator and
vice-versa when the supply is restored.
The important attached to cases of operation in hospitals and airport in
order to save life from generator as fast as possible makes it important for
the design construction of automatic change-over switch which would solve the
problem of manpower and the danger likely to been countered changeover.
The electronic control monitors the incoming public supply voltage and detects when the voltage drops below a level that electrical or electronics gadgets can function depending on the utility.