SYNOPSIS
landed properties ( houses ) have been observed, undergoing changes in their design shapes and uses, this changes in use as a result of alteration being made could also be know as redevelopment, that is the restructuring of the building to suite the uses which they were designated.
this dissertation in the pros of redevelopment in an urban centre, which is ilorin metropolis.
further more, it examines the causes of redevelopment and analysis its effect on re-development properties developer and property users.
it also, highlights the significance of redevelopment challenges analysis of any project.
CHAPTER ONE
- INTRODUCTION
A
study of road property investment in ilorin
revealed a number of constraints which were associated with the regulation of
houses that is the restructuring of building.
In
the area of pre- investment students for property development or redevelopment
the anticipated return can only be tested or ascertained with proper
understanding analysis and taking into consideration.
The
factor affecting redevelopment omuojine ( 1993) history has it that ilorin was founded orgurally by those who built according to
hallet arahan ( 1979) all value in arty hand
under go continue evaluation form a stage of non existence through a
circle of change.
In Nigeria the law of Nigeria (1948) cap 155 defines development or redevelopment as any building operation and any use of land or any building there in for a proposed which is disproved from the proposed which the land for building was last being used.
More
ever, british town and country planning act (1947) carrying out building engineer,
mining or other operation in an over, under land or the making of any material
residential building in the area, which later brought up to a standard of a
distinct settlement most of those building built were able to change in their
use as a result of the development of the town physically environmentally and
economically.
With
the federal government pronouncement of ilorin
as a capital of kwara state.
There
arose the need to create a business district and the resultant use for
commercial use some are bergs restored to us
formal use due to obsolescence that had set on the building for instance
a three (3) bedroom residential could have it use change to an estate surveyors
office.
Similar conversion may governor involve tampering with the structure by way of pulling down we all, addition of new accommodation and imploring the physical fabrics of the building.
Also,
an obsolete terminates building with eight (5) rooms (i.e. face to face) may be
converted to flat or any other type of design.
Although,
the redevelopment enhancement aesthetic value of the building and make
alternative enough for the type of the use proposed.
More so in some cases, alternation may have to be done to be both the internal and external part of the building for instance a converted office accommodation proposed to house a new bank may give it s approach view redesign and filled with many architectural decoration further more the frontal fence may have to be pulled down to aid visibility and give room for parking lots redevelopment project cannot be carried out without learning some task or challenge on the developer and even the property consumer.
In carrying out such project the developers encounter difficulties which stand as obstacle to the successful, efficient and effective development redevelopment project.
The
challenge includes government policies building material the real estate
finance and others.
1.1 STATEMENT OF THE PROBLEM
As
it is not unusual for any dissertation like this to be constrained due to some reasons. this
particular project work. he therefore, not has been an exception. there
searcher had been confronted with the inadequate fund to carryout the project
work. he had utilized the very limited resource at his disposal to work toward
the success of the work.
Insufficient
time was another problem. the writer has to distribute the short available time
at his disposal to the pursuit of this project work and to other academic
pursuits.
During
the collection of the data used for this project work, the researcher was faced
with the poor response of the few available people or property owners
interviewed thinking that the researcher may have be one of the frauds in the
town, thus preferred to keep their words to themselves.
Inadequate
literatures on the topic has been of the
problem faced as the researcher could
not lay his hand on one quick referencing, thus, making him to rely
exclusively on the data gotten from the field.
Another
major problem was the unavailability of some property owners for interview by
the researcher.
1.2 AIM
To
examine the challenges and prospect of within the redevelopment property in the
study area
1.2 OBJECTIVES
- To identify the properties under
redevelopment on the case study
- To know the stage of the
properties under
- To examine the prospect of the
properties redevelopment
- To examine the challenge involve in
the redevelopment